For this project I was project manager and designer.  The p[project began with documenting a new procedure and creating an experience map to identify opportunities.


While a good amount of UX and ID was done in the early stages, the project's intended output was a compelling pitch deck based on solid end user research, although no formative studies were conducted.   I won't go into the details of the the medical procedure being designed for.  The following are images from presentations and the pitch deck.  
Process, progression.  Early brainstorming, documentation from clinic visits, and early prototypes.
The console was not fully developed- we explored a few UI layouts for a formative test.  For the distal wands, Early UI models were created (and since lost) The ablation tool(s) were carefully architected with this specific part of the procedure in mind.  

You may also like

Back to Top